Stategic advice about electricity wayleaves and pylon disputes

At the conceptual stage of development planning we are able to offer high-level advice on the impact of electricity infrastructure. Given the time period required to relocate high voltage lines this is an ideal opportunity to review the impact of lines crossing proposed development and the potential for removal or diversion of infrastructure that would impede development.

This advice can range from a high level report identifying the issues to be addressed, liaison with appropriate organisations and an analysis on the options available to a desktop study or a detailed investigation. We are able to provide a cost effective input to multi disciplinary teams for large-scale development. A review can range from a study into a single site to a portfolio review. Our advice can be very cost effective and avoid misleading assumptions being made at the embryonic stage.

Pylons